My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 Transportation and Traffic <br /> } <br /> TABLE 3.2-2 <br /> * EXISTING PLUS PROJECT LEVELS OF SERVICE ON AREA ROADWAYS a <br /> -� Existing Conditions Existing plus Project Conditions <br /> bb Maximum Maximum Hourly <br /> e'k Roadway Hourly Traffic" LOS Traffic` LOS <br /> [East River Road <br /> .. <br /> �... <br /> West of Quarry Access Road 95 B 161 C <br /> East of Quarry Access Road 94 B 160 C <br /> .yuwwxr x,.... ,nrm — *• _nnmwx <br /> `+ McHenry Avenue <br /> .v-ti.... ...:.ka.......rz:.-...�..:^. -�:.. ..... <br /> North of East River Road 222 B 288 C <br /> .._............_. _ _ _—.._.,........---................................. <br /> i South of East River Road 299 C 365 C <br /> South of East River Road 157 B 223 C <br /> 1 a. All traffic count data represents bi-directional volumes. <br /> d b. Maximum hourly traffic represents highest traffic hour observed along the roadway(9:00 to 10:00 PM}. <br /> c. Includes the added 66 truck trips to the roadway segment. <br /> SOURCE:ESA. <br /> Project-generated trips during subsequent hours(from 10:00 PM to 5:00 AM)would have less of an <br /> effect on traffic flow conditions than during the above-described peak nighttime hour,as Project trips <br /> would be lower,and background traffic volumes during those later hours are lower.Thus,the proposed <br /> 1. <br /> Project would neither conflict with an applicable plan,ordinance or policy establishing measures <br /> of effectiveness for the performance of the circulation system, nor conflict with an applicable <br /> congestion management program,including,but not limited to level of service standards and <br /> r travel demand measures, or other standards established by the county congestion management <br /> t ; agency for designated roads or highways. <br /> ►TM. Project-generated trips during subsequent hours(from 10:00 PM to 5:00 AM)would have less of an <br /> effect on traffic flow conditions than during the above-described peak nighttime hour,as Project <br /> trips would be lower,and background'traffic volumes during those later hours are lower.Thus,the <br /> proposed Project would neither conflict with an applicable plan, ordinance or policy establishing <br /> measures of effectiveness for the performance of the circulation system, nor conflict with an <br /> �~ applicable congestion management program,including, but not limited to level of service <br /> standards and travel demand measures,or other standards established by the county congestion <br /> z <br /> i management agency for designated roads or highways. <br /> aMitigation: None required. <br /> i <br /> Munn&Perkins Quarry Excavation Permit 3.2-9 ESA 1211086 <br /> Draft EIR April 2011 <br /> �t� <br />
The URL can be used to link to this page
Your browser does not support the video tag.