Laserfiche WebLink
Munn&Perkins Quarry Excavation Permit <br /> Existing Noise Environment <br /> The noise environments in areas surrounding the project site are influenced primarily by agricultural- <br /> associated operations,truck and automobile traffic on local roadways,and existing project aggregate <br /> mining and transportation operations. During nighttime hours when the project facility is not in <br /> operation, noise exposure at many locations in the project area is dominated by natural sources <br /> (e.g., animals, wind). <br /> The primary noise-sensitive receivers affected by the project are located along East River Road(north) <br /> and Burwood Road(east).Noise-sensitive, single-family residential receivers are located within <br /> 1,000 feet north and 1,900 feet east of the project site. Figure 3.4-1 shows the project vicinity. <br /> Ambient Noise Level Measurement Results <br /> The following information is provided based on the Environmental Noise Assessment completed <br /> by BAC on August 18, 2010. Long-term ambient noise level measurements were completed in <br /> the project vicinity near the closest noise-sensitive receivers to the project on September 27, 2010 <br /> thru October 2, 2010, Sites A and B represent the closest receivers on Burwood Road while Sites <br /> 1-5 represent the closest receivers on East River Road. Table 3.4-2 is a summary of the ambient <br /> noise level measurement results. <br /> TABLE 3.4-2 <br /> SUMMARY OF AMBIENT NOISE LEVEL MEASUREMENTS <br /> Average Hourly Noise Level,dB 2,3 <br /> Daytime Hours(7 a.m.-10 p.m.) Nighttime Hours(10 p.m.-7 a.m.) <br /> Measurement Site <br /> (Distance to C.L.)' L q Ln_x Lea Lm Lon,dB <br /> A 43-51 62-70 42-46 67-70 49-53 <br /> B � 48-56 67-88 ��- 45-47 �- 70-72 52-56 <br /> 1 (40 feet) 71-73 91-106 65-68 88-95 73-75 <br /> 2(350 feet) 55-58 75-85 53-56 70-85 60-62 <br /> 3(50 feet) 67-69 89-99 63-65 84-98 70-72 <br /> 4(60 feet) 64-67 86-96 59-62 82-86 67-69 <br /> 5(50 feet) 65-69 85-94 61-64 84-92 69-71 <br /> 1. Distance from centerline of East River Road to noise level measurement site. <br /> 2. Daily noise level averages for September 27,2010 thru October 2,2010. <br /> 3. Does not include noise exposure from almond harvesting near Sites A and Bon October 2,2010. <br /> SOURCE: Bollard Acoustical Consultants,Inc.,August 18,2010. <br /> Since the project represents the addition <br /> of asphalt plant and associated operations during the hours <br /> of 9 p.m.,to 5 a.m., it is of interest to compare project-related noise exposure to existing ambient <br /> noise exposure during these hours.A summary of the measure ambient noise exposure in the project <br /> vicinity during the hours of 9 p.m.to 5 a.m. on September 28, 2010 thru October 2, 2010 is <br /> presented in Table 3.4-3. <br /> Munn&Perkins Quarry Excavation Permit 3.4-10 ESA 1211086 <br /> Draft EIR April 2011 <br />