Laserfiche WebLink
Munn&Perkins Quarry Excavation Permit <br /> truck noise exposure would be expected to exceed the applicable County noise exposure limit of <br /> 65 dB L&.With the proposed optimization of haul truck operations using specified parameters, <br /> project haul truck noise exposure would not be expected to exceed the County exterior noise <br /> exposure limit.Project haul truck noise exposure within the closest residences to the project <br /> would not be expected to exceed the applicable County interior noise exposure limit of 45 dB Ldp. <br /> Assuming typical,not optimized operations of the project haul trucks,noise exposure from this <br /> source would be expected to add no less than 2 dB to the noise environments of residences on <br /> East River Road(60 feet from roadway centerline)closest to the project site. This noise exposure <br /> increase would be considered significant based on the applicable 1.5 dB increase criterion.Assuming <br /> the proposed operation of project haul trucks using the optimized parameters discussed above,noise <br /> exposure from this source would be expected to add less than 1 dB to the noise environments of <br /> receivers on East River Road near the project site.This noise exposure increase would be considered <br /> less than significant. <br /> The probability of awakenings due to project haul truck operations on East River Road was calculated <br /> to be approximately 89 -93 percent for residences 60 feet from the centerline of the roadway. The <br /> lower probability(89 percent)is related to the application of proposed optimized truck operating <br /> parameters, with the upper probability(93 percent)assuming typical operations. The probability <br /> of awakenings was calculated to be 99- 100 percent when the cumulative effects of existing vehicle <br /> traffic and project haul trucks on East River Road were combined. The increase in probability of <br /> awakenings due to the project haul trucks was calculated to be 7-8 percent.This level of increase <br /> is considered significant. <br /> Mitigation Measure 3.4.1: All project trucks shall be operated using noise-mitigating operating <br /> parameters when entering or leaving the plant on East River Road. Based on testing conducted by <br /> Bollard Acoustical Consultant, Inc.,the quietest haul truck operating parameters were as follows. <br /> • Empty Trucks: Travel speed at 38-43 mph with engines in 8t1i gear at 700-800 rpm. <br /> • Loaded Trucks: Travels speed of 33-35 mph with engines in 6th or 7 ear at 1 400-1,600 r <br /> p p gg � m.p <br /> Furthermore,truck parking anywhere along River Road and the use of jakc breaks at the <br /> McHenry Ave/River road intersection is prohibited. <br /> Significance After Mitigation: Application of the proposed optimized haul truck operating <br /> parameters in Mitigation Measure 3.4.1 would be expected to effectively mitigate project-related <br /> noise exposure from the perspective of the applicable County noise exposure level criteria and <br /> noise exposure level increase criteria. However, application of the optimized haul truck operating <br /> parameters would not appreciably mitigate the significant increase in probability of residential <br /> awakenings due to project haul truck operations. Due to the significant increase in probability of <br /> residential awakenings in the project area due to project haul truck passbys,this impact is <br /> considered significant and unavoidable. <br /> Munn&Perkins Quarry Excavation Permit 3.4-16 PSA 1211086 <br /> Draft EIR April 2011 <br />