My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t FiZirnbra http:I/Brun:I2 U/zintbra/h/printinessage'!td-,i,iblz <br /> Good afternoon, Kevin <br /> Pursuant to your request, I have computed the numbers of Munn&Perkins heavy truck trips which could occur between the <br /> I — hours of 9 pm and 5 am(outside currently permitted hours),without exceeding 65 dB Ldn at the nearest residences to East River <br /> Road'. Because the computation of Ldn includes a 10 dB penalty for trucks operating during nighttime hours,the total number of <br /> truck trips Munn&Perkins can generate without exceeding 65 Ldn depends on whether the night paving project starts at 9 pm or <br /> after 10 pm. I have worked out the numbers both ways. <br /> C Scenario 1: tight paving project begins at 9 pm <br /> 9–10 pm: 66 truck trips(33 loads) <br /> 10 pm–5 am: 140 truck trips(70 loads) <br />{ <br /> Scenario 2: Night paving project begins after 10 pm <br /> 10 pert–5 am: 145 total truck trips(72.5 loads) <br /> So to summarize, Munn&Perkins can generate a total of 103 truck loads wilhout exceeding 65 dB Ldn at the nearest residences <br /> F on East River Road,provided that 33 of those loads occur between 9 and 10 pm. <br /> F, <br /> t If, however,the night paving project does not begin until after 10 pm, Munn&Perkins could generate 72.5 loads without <br /> exceeding 65 Ldn at those same residences. <br /> I hope this information makes sense, but if not please do not hesitate to call me. <br /> Paul <br /> t_: <br /> Paul Bollard, President <br /> Institute of Noise Control Engineers(INCE), Board Certified Member <br /> r� Bollard Acoustical Consultants, Inc. (BAG) <br /> 455 Main Street,Suite 3 <br /> r Newcastle, CA 95658 <br /> r - Office(916)663-0500 <br /> 111 <br /> Fax(916)663-0501 <br /> Cell(916)765-4113 <br /> ( Please visit BACNOiSE.COM to vew or download SAC Qualifications, Insurance Information, Rate Sheet, Representative Project <br /> Experience, and Staff Photos. <br /> Ff <br /> i� <br /> l <br /> i <br /> t ' <br /> 2 of 2 09/07/2010 4:56 I'M <br />
The URL can be used to link to this page
Your browser does not support the video tag.