My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2600 - Land Use Program
>
QX-89-0002
>
SU0007300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 3:08:38 PM
Creation date
9/9/2019 9:06:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007300
PE
2656
FACILITY_NAME
QX-89-0002
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
APN
24722019
ENTERED_DATE
7/29/2008 12:00:00 AM
SITE_LOCATION
26292 E RIVER RD
RECEIVED_DATE
7/28/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\26292\QX-890002\SU0007300\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
629
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter C <br /> as�q "•moo s <br /> •"G <br /> WE <br /> j THOMAS M.GAU P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR <br /> (209)468-3000 FAX(209)468-2999 <br /> %vww sjgov.org <br /> MICHAEL SELLING <br /> DEPUTY DIRECTOR 4ZN <br /> STEVEN WINKLER Warldn for YOU <br /> DEPUTY DIRECTOR <br /> ROGER JAMES <br /> BUSINESS ADNITNISTRATOR <br /> John Funderburg, Principal Planner <br /> San Joaquin County Community Development Department <br /> 1810 E. Hazelton Ave. <br /> Stockton, California 95202 <br /> Date: August 23, 2011 <br /> SUBJECT: Draft Environmental Impact Report for the Munn and Perkins Quarry <br /> The San Joaquin County (County) Department of Public Works has reviewed the above referenced C-1 <br /> document and has the following concerns or comments: <br /> Public Services Comments: <br /> 1. Mitigation Measure 3.4.1: Suggest moving the "no parking anywhere along River Road" to 3.2 <br /> Traffic and Circulation as it appears to be a traffic safety issue and not a noise issue. If this is the C-2 <br /> case, it should be discussed in the body of 3.2 (trucks lined up on the E. River Road shoulder <br /> waiting to get into the facility on the limited width roadway) <br /> 2. Mitigation Measure 3.4.1: Suggest revising "the use of jake breaks at the McHenry Ave/River I C-3 <br /> road intersection is prohibited." to "the use of jake,reads brakes at the McHenry Ave/E. River <br /> rRoad intersection and the ERiver Road/project driveway is prohibited." <br /> 3. Suggest adding a Mitigation Monitoring Plan that includes the following: During extended hours, <br /> the limitations on allowable truck traffic RPM's when entering or leaving the plant on East River <br /> Road, the prohibition of the use of Jake Brakes at the intersections of McHenry Ave/E. River C-4 <br /> Road and E. River Road/project driveway, and the `No Parking'along the E. River Road public <br /> right-of-way shall be monitored full time by Applicant beginning one-half hour prior to any <br /> approved extended hour operations. <br /> Thank you for the opportunity to be heard. Should you have questions or need additional information <br /> regarding the above comments, please contact me at (209) 468-3085. <br /> Since C-5 <br /> Mark Hopkins <br /> Senior Planner <br /> CC: Alex Chetley, Senior Civil Engineer (Public Services) <br /> Firoz Vohra, Senior Traffic Engineer (Transportation Engineering) <br />
The URL can be used to link to this page
Your browser does not support the video tag.