Laserfiche WebLink
5. Miogakon Man€taring and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Monitoring/Reporting <br /> Impact Mitigation Measure Implementation Timing Responsibility Timing <br /> Visual and Lighting Measure 3.1.1:All outdoor lighting will be required to be fully shielded and Requirements shall be Community Development Lighting plans shafl be <br /> shall adhere to Section 9-1025.6 of the Development Code in order to incorporated into the design Department reviewed and approved prior <br /> minimize any impacts resulting from outdoor lighting on adjacent properties. of any proposed or required to issuance of permit for any <br /> exterior lighting new exterior lighting <br /> Air Quality and Measure 3.3.1:The operator shall incorporate additives to the rubberized Ongoing during all night time Community Development Operator shall maintain <br /> Climate Change asphalt mix in accordance with accepted industry standards.The objective of operations. Department[note that the records of all night time <br /> the additives shall be to reduce offensive odors associated with the production SJVAPC also has the operations. including any <br /> of rubberized asphalt.The operator shall consider technological authority to investigate odor contacts from the Air District <br /> improvements to reduce odors,as they become available,and incorporate if complaints] or others regarding odor <br /> feasible. complaints. and produce <br /> those records to the County <br /> upon request. <br /> Noise Measure 3.4.1:All project trucks shall be operated using noise-mitigating Operator shall inform all Community Development Operator shall maintain <br /> operating parameters when entering or leaving the plant on East River Road, truck operators of the Department records of all night time <br /> Based on testing conducted by Bollard Acoustical Consultant. Inc.,the requirements and maintain a operations, including the <br /> quietest haul truck operating parameters were as follows: full-time monitor during night presence of a truck monitor. <br /> • empty Trucks: Travel speed at 38-43 mph with engines in 8`I'gear time operations. and provide those records to <br /> at 700-800 rpm. the County upon request <br /> Loaded Trucks: Travel speed of 33-35 mph with engines in 61"or <br /> 7"'gear at 1,400-1,600 rpm. <br /> Furthermore.truck parking anywhere along River Road and the use of jake <br /> brakes at the McHenry Ave/F, River Road intersection and the E. River <br /> Road/project driveway is prohibited.The applicant shall monitor full time for <br /> compliance with these requirements beginning 30 minutes prior to any <br /> approved extended hour operations. <br /> Wrm 3 Perkins Ooarry Gxcavet-an Pnrmd 5-3 E A 01101E <br /> Final Cnvirnnmerml Impact Repo! <br />