Laserfiche WebLink
Apr 11 03 01 : 09p ssilo 209-824-0:JJo p• .a <br /> J <br /> The Contractor shall submit a Warrantee Surety in the amount of ten percent (I0%)prior to <br /> the District's Board of Directors accepting the WORK UNIT. The Warrantee Surety shall run <br /> for 12 months(from the time the District records a"Notice of Completion")or for such longer <br /> period as provided by law Any form of Surety shall provide that no change, ez_e-sion of <br /> time,alteration,or addition to the terms of the AGREEMENT,or the WORK to be performed <br /> thereunder,orthePLANS and DRAWINGS and STANDARD SPECIFICATIONS shall in any <br /> wise affect its obligation on the surety, and the Surety waives notice thereof. <br /> If, in the opinion of the DISTRICT, defective equipment, materials, or supplies creates a <br /> dangerous condition or requires immediate correction or attention to prevent further loss to the <br /> DISTRICT or to prevent intemtption of operations of the DISTRICT, the DISTRICT will <br /> attempt to give the notice required by this article. If the OWNER cannot be contacted or does <br /> not comply with the DISTRICTS request for correction within a reasonable time as determined <br /> by the DISTRICT,the DISTRICT may,notwithstanding the provisions of this article,proceed <br /> to make such correction or provide such attention;and the costs of such correction or attention <br /> shall be charged against the OWNER. Such action by the DISTRICT will not relieve the <br /> OWNER of the guarantees required by this article or elsewhere in the AGREE-MEN'T or <br /> STANDARD SPECIFICATIONS. <br /> This article does not in anyway limit the guarantee on any items for which a longer guarantee <br /> is specified or any items for which a manufacturer or supplier gives a guarantee for a longer <br /> period. The OWNER agrees to act as a co-guarantor with such manufacturer or supplier and <br /> shall furnish the DISTRICT all appropriate guarantee or warranty certificates upou completion <br /> of the WORK UNIT. No guarantee period whether provided for in this article or els,-where <br /> shall in any way limit the liability of OWNER or his sureties or insurers under the indrntnity <br /> or insurance provisions of this AGREEMENT. <br /> 1-6 TIME FOR COMPLETION AND DAMAGES DUE TO DELAY <br /> The OWNER shall complete all or any designated portion of the WORK UNIT called for <br /> under this AGREEMENT within the time set forth on the PLANS and DRAWTVGS or <br /> STANDARD SPECIFICATIONS. Time is of the essence under this AGREEMEVT. <br /> Development Agreement I 1 of 21 <br />