Laserfiche WebLink
Apr 11 03 01 : 12p SSJID 209-824-OJJb p- cc <br /> RprCPR.111V�i0 1 ,2W F'I 1 RESOI.RCES 209-Y MD.8818 P.2 P. 21 <br /> 336 <br /> SPECIAL DISTRICT'B0.4RD OF DIRECTORS CONDff10,NS <br /> EXHIBIT "It" <br /> The follow ng special condinon shall apply to th,QU&lTy.Excavation IDr The Reed Leasing <br /> Group,LLC, hereinafter referred to as Reed(PA-2020370(QX). 27865 E. River Road, Escalon) <br /> [APN 247-230-091. <br /> l Reed shall submit improvement pLu1s to tti Nstncu Enginocring Department and secure <br /> District approval before the start of any work with n fifty(50)feeFoMmirict facilities' <br /> and comply with all standard requirements imposed by the District colteetniti� <br /> lmprovements to District facilities_ <br /> 2 Reed shall replace the existing pipeline with new reinforced concrete pipe and relocate to <br /> :location along the outer palmeta of cxcavA:ion, complete and acceptable to District, <br /> prior to start of any excavation work within fifty(50)feet of existing District facilities. <br /> The specifications of the pipe-aid the loca^,on of the pipellne aro subject to approval iu <br /> advance by District The uew pipebuc stiall be sued to convey water wittrar least the <br /> same flow rate and head loss chbracfer ra as the ex stipg pipeline. <br /> 3 Reed shall be allowed to betmezcavation(r:inmg) activities prior to the replacement of <br /> Cie Distnct pipeline, provided that eatcavaLon approub-no closer than 50 feet from the <br /> centerline of the existing pipeline tool tye-ew ptoclincis installed and fully acceptable <br /> to District <br /> A. prior to cotumencement of any work to replace the existing pipeline,new easements shall <br /> be dedicated, as required by SSJID to aceonsodate replacement of the existing pipeline. <br /> and an E=Oachimcnt Ageei,.wwt•sipted to cover any proposed eneroachmmts of the new <br /> casement, both to be in fors+acceptable to Disotct <br /> 5. A ret.rimer shall be submitted to cover Lni@al plats checking and inspections required for <br /> the project in accordance vrim the 1?istria•s current established fee schedule. <br /> DcvolopMMt AVl Mery 20 of 2 f <br />