My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
point of time a maximum of one phase is being reclaimed while c-e phase is being excavated <br /> (Development Title Section 9-1415.3[0]) s the <br /> m TIME LIMITATION: The Quarry Ex Permit <br /> shall <br /> remain <br /> ent I, �t asctiol9ng4a15.3[ p])excavation <br /> continues in compliance with the approved Per <br /> (1) Phase I excavation shall be completed by 2007, and reclamatic- s-.all be completed by 2009. <br /> (2) Phase II excavation shall be completed by 2009, and reclamat[- shall be completed by 2011. <br /> (3) Phase III excavation shall be completed by 20013, and reclarra= shall be completed by 2015. <br /> be conducted by <br /> he <br /> n. ANNUAL ensureINSPECTION IREPORTS:the conditionspections of the o`the permit and=a reclamatlion plan. The County <br /> County to ensure comp <br /> may use professional services as provided for f Section 9-240.1' --e thenserson In cha charge of the - <br /> by San Joaquin County Upon compl be selected <br /> letion o � annual d the C�� a repo which shalt contain aff - == <br /> mining operation shall submit to the State 207 of the i <br /> inspectiondoshall a paid it tie minby e opera tor. Additional nslpect.`s a sbecondu ted, but the cost <br /> inadditional inspections shall be paid for by the mine opera'_- --ly if non-compliance with the <br /> of conditions of the Quarry Excavation Permit or the reclamatio <br /> - is found. (Development Title <br /> Section 9-1415.3[q]) - - <br /> c regulations. the applicant shall <br /> p. PERFORMANCE GUARANTEE: In order to ensure reclarra_" of the site, compliance with <br /> conditions of approval, and compliance with County and State m - -_ 9 <br /> provide performance guarantees as a condi ion of the issuance the Quarry ovcaabatithe County <br /> The amount and form of the guarantee shall be subject to annua pp y <br /> and the State, and the amount shall be adequate to ensure recla =-�nf�fan'cialbguda antee shallabe <br /> to be disturbed during a given phase. The annual review - <br /> coordinated with the annual inspection and approval of success_'•= reclamation security so that the <br /> guarantee includes the amount of disturbed land plus the amec-= y`te�med byland e he Developmend to be dt <br /> during the next 12 months, less the amount of land previou_.� <br /> an <br /> Services Division's annual surety tbonnd, (2)a been <br /> fund with the dead agency,me performance <br /> (3)rant irrevocable <br /> n the form of either (1) a surety the trust fund account. <br /> letter financafl credit.guarantee shalAny l be payablerest dtonSan Joaqust lnd Coulnty cr e"Department of Conservation" <br /> under the applicable provisions of the County and the State raining regulations. The financial <br /> guarantee shall be callable by the County or the State under the foAowing circumstances: <br /> (1) The applicant causes the excavation to become idle (as defined in Section 9-110 of the <br /> Development Title)without an approved interim manageme-.t plan, <br /> (2) The applicant files for bankruptcy, <br /> (3) The County or State determines on the basis of annual in=_-ec`_ons and reports that the applicant <br /> has not maintained substantial compliance with the approve-- Permit; <br /> (4) There arises an occurrence or circumstance which, in opinion of the County or State, <br /> jeopardizes the site reclamation; or <br /> e findings specified i- =-tion 2774.4(a) of the State Public <br /> (5) The State makes one or more of th <br /> Resources Code. <br /> PA-02-370\N & F Farms <br /> San Joaquin County Page 10 <br /> l^..mmiinity Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.