My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002496 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROBINSON
>
13124
>
2600 - Land Use Program
>
SA-01-23
>
SU0002496 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:15 AM
Creation date
9/9/2019 9:08:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002496
PE
2633
FACILITY_NAME
SA-01-23
STREET_NUMBER
13124
Direction
S
STREET_NAME
ROBINSON
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
13124 S ROBINSON RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROBINSON\13124\SA-01-23\SU0002496\NL STDY MGMT PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fana Dairy#130 Water Storage System Monthly Balance Chart 130-11 waste charts,phase I <br /> Settling Ponds <br /> Phase I <br /> Total All Cattle: 1,225 <br /> Settling Pond Capacity: d per two ponds <br /> Summer Settling Pond Storage: Winter Settling Pond Storage: <br /> 1st 2nd 3rd 4th 51h 6h 1st 2nd 3rd 4th 6th 6thl <br /> Solids Collected 34,338 33,231 34,338 34,336 31,015 34,336 35,378 34,237 35,378 35,378 31,954 35,378 <br /> Liquids Collected 137,353 132,922 137,353 137,353 124,061 137,353 141,512 136,948 141,512 141,512 127,818 141,512 <br /> Accumulation into pond 171,691 337,844 509,535 681,226 836,301 1,007,992 176,891 348,075 524,966 701,856 861,628 1,038,519 <br /> Total Storage Required: 2,046,511 f <br /> Data references: <br /> Reference"Dairy Facility 114anure/Nutrient/Flush Production Chart". <br /> There are three ponds at 998,545 gallons each plus 2.5'of flood freeboard. <br /> j Settling ponds in use operate"full"as solids settle out and accumulate. <br /> Note-Settling pond use is alternated Once one has become"loaded"with solids,the effluent is diverted to another pond. <br /> The loaded pond is then pumped dry,starting the composting cycle of the manure.Once the solids has composted,it will be spread on site as fertilizer or sold off site. <br /> Site use or off site sale is determined by correct agronomical application of nutrients to on site grasses and/or farm crops. <br /> I <br /> Page 1 <br /> Water Storage Sys i am Monthly Balance Chart <br /> VIE <br />
The URL can be used to link to this page
Your browser does not support the video tag.