Laserfiche WebLink
` PA-03-429 (SA) vow, 'Moe <br /> Page 2 of 2 <br /> D. Applicant shall prepare a detailed schematic shoeing all milking equipment (tank, <br /> pipeline, etc...) in milk-barn and milk-house prior to final occupancy approval by <br /> Environmental Health Department. A plan review fee of$186.00 shall accompany <br /> these plans per Board of Supervisors Resolution 90-620. <br /> E. Install an approved back-flow prevention device on the water supply system(s) <br /> (California Code of Regulations, Title 17, Section 7603). <br /> NOTE: The water supply to the dairy barn must be protected from all outside sources by <br /> use of reduced pressure backflow devices. All water hose bibs must have <br /> backflow devices, and RIPS are required at all chemical injection sites. <br /> F. All liquid and solid dairy wastes from this operation are to be retained on the <br /> premises so as not to cause a nuisance or a health problem (Porter-Cologne Water <br /> Quality Control Act, Chapter 4, Article 4, Section 13260-13263). <br /> G. All liquid and solid dairy wastes and vector problems associated with this dairy <br /> operation are to be retained on the premises so as not to cause a nuisance or a health <br /> problem (Porter-Cologne Water Quality Control Act, Chapter 4, Article 4, Section <br /> 13260-13263). Any complaints that are verified against this site will be charged the <br /> Environmental Health Department hourly rate of 593.00 for response and correction <br /> as per Board of Supervisors Resolution B-92-1591. <br /> H. Construction of individual sewage disposal system(s) for the milk-barn septic system <br /> under permit and inspection by the Environmental Health Department is required at <br /> the time of development(San Joaquin County Development Title, Section 9-1110.3 & <br /> 9-1110.4). <br /> I. The Environmental Health Department is recommending the installation of <br /> monitoring wells on this dairy facility for ongoing groundwater monitoring of nitrates. <br /> Total Dissolved Solids(TDS),etc. The final determination of the installation of these <br /> wells and the monitoring required is subject to Central Valley Regional Water Quality <br /> Control Board approval. <br />