My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and other vehicles at the Union Pacific Intermodal Facility with Ambient-Sensitive Self-Adjusting Backup <br /> Alarms,which automatically increase or decrease their volume based upon background noise levels to ensure <br /> that the tone produced is no louder than necessary. The applicant will also be required to test the safety <br /> implications of replacing single-tone backup alarms with less intrusive broadband noise types and determine if <br /> such replacement is feasible without compromising yard safety. <br /> The applicant will be required to implement Mitigation Measures NOISE-1a, NOISE-Ib, NOISE-Ic, and <br /> NOISE-ld as a condition of project approval, and if all of the devices described in such mitigation measures <br /> are utilized, noise impacts from project operations will be less than significant. However, electric hybrid <br /> cranes and/or broadband noise alarms may not be feasible. The applicant, Union Pacific, has advised the <br /> County that it maintains the largest intermodal network in North America, including 34 intermodal terminals <br /> within the United States and more than 100,000 containers riding on 32,000 miles of track. Union Pacific has <br /> informed the County that it has not had sufficient experience utilizing electric hybrid cranes or broadband <br /> noise alarms in an intermodal yard environmental to determine whether such devices are operationally feasible <br /> or whether such devices would compromise intermodal yard safety. Hence, while Union Pacific is obligated <br /> to test the feasibility of these devices in yard conditions under Mitigation Measures NOISE-lc and NOISE- <br /> ld,respectively,it cannot be assured that such devices will be feasible after testing,and the impact is therefore <br /> significant and unavoidable. <br /> November 2012 29 Findings of Fact/ <br /> Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.