Laserfiche WebLink
,Q I <br /> 14. <br /> / Name of Supplier.Owner or Dealer Address No.and Street(s) City state Date of TNr <br /> y 15. TANK TO TEST 16. CAPACITY From <br /> Z -LJ Station Chart <br /> —1 �� �,.) By most accurate <br /> m 7 � <br /> I 1.i���' Nominal Capacity capacity chart available y O Tank Manufacturer's Chart <br /> y O Ln,,,avby position Gallons Gallons L I Company Engineering Data <br /> Is there doubt as to True Capacity 7 ❑No Charts supplied with <br /> hBran and Wind See Section"DETERMINING TANK CAPACITY" Other <br /> 17. FILL UP FOR TEST S A.P.I. GRAVITY @ °F=�i..��� A.P.I. GRAVITY (g1 60° IF Stick Readings Total Gauons <br /> THERMAL SENSOR NM Gto K In. Gallons sa.Reading <br /> � <br /> Stick Water Bottom J <br /> before Fill-up —�� _. _ Inventory __ O �`� 1C) <br /> to Ye in. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY q <br /> Tank DiameterC� A Product In full tank(up to fill pipe) <br /> �0 <br /> .o, <br /> 00 <br /> 0 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> W <br /> A0 X n See manual sections applicable.Check below and record procedure in log(26). stage 1 <br /> ? n <br /> j0 ( <br /> A M (W(�ater In tank �Hi�h water table in tpnk{excavation � Llne(s)being tested with LVLLT stege IN <br /> W ILL <br /> 0 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> K) <br /> 0 19. TANK MEASUREMENTS FOR Is Today Warmer? Colder?I]` �f Product in Tank 7L°F Fill-up Product on Truck—°F Expected Change(�er - ) <br /> TSTT ASSEMBLY 3/ <br /> LnBottom of tank to Grade*.. I l 'F <br /> Ln �''''''''''''''''' , 22. ThermaF-Sensor reading atter circulation <br /> Add 30"for 4"L ................. agrts Near" <br /> Add <br /> — G► <br /> Add 24"for 3"L or air seal ....... _ 23. Digits per°F in range of expected charge Z,/ 11 <br /> S digits <br /> Total tubing to assemble Approximate ........ _ <br /> 20. EXTENSION HOSE SETTING 24' <br /> total� ()o� x r ` v — 1 1 <br /> , al q antity In coefficient of expansion for volume O i this tank <br /> Tank top to grade................................... _. , full tank(16 or 17) involved product per IF r 1 <br /> Emend hose on suction tube 6"or more % G <br /> below tank top ...................._...............` u:J. 1 n 25. G' � ..JV � _ /l.' �,l'. l 1 "' This is <br /> volume change per°F(24) Digits per°F in test Voiunte change per digit bw <br /> If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. tact"(a) <br /> Z6. 30. HYDROSTATIC 31. VOLUME MEASUREMENTS(YI 34. TEMPERATURE COMPENSATION 38.NET VOLUME 39. ACCUMULATED <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO.11I GAL. USE FACTOR W CHANGES CHANGE <br /> CONTROL EACH READING <br /> l35. 36. 31. Teapefstare At No Lam r.ure <br /> 21. 28. yg. Standpipe Leval 32. Product in ProductCl <br /> in Inches uage Computation Adjustment I"Eat aaaacom <br /> 1MI1 Record details of setting up loading Graduate Replaced(-) Thermal Higher+ (ri . (a)- Volume ki�hnus <br /> and running test. (Use full Mo. gaQinninp Level to Sensor Lower- Expansion+ Expa son(+)or Y Lem heal <br /> length of line if needed.) of which 9.foin Aftu Product Reding (c) Catbactsim- Convection(-) change per Year <br /> TIME #AV)—e37(T) IMFMrrirYl <br /> (24 k) Reading Restored Reding Reading Recovered(+) <br /> 1/�I7 6 I ✓ Lbin <br />