Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> toring procedures,unless required to obtain approval or a permit before making <br /> within 30 days of any changes to the moni <br /> the change.Required by CCR 2632(d)and 2641 (h). <br /> The Record, a Division of <br /> FACILITY NAME World Companies, Inc. DATE T ly 1 , 2ng2 <br /> FACILITY ADDRESS 530 E. Market Street, Stockton, CA 95202 <br /> l.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br /> Jim Frankel, Maintenance Teian gar <br /> Jesus Estrada Maintenance <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS Daily — Monday — Friday PIPING <br /> 3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br /> Monitor = Guard Shack, Tank = Sensors <br /> 4.Describe the following equipmentfor each underground storage tank. <br /> Name and Model of Monitoring Panel Veeder- Root, ILS-350 UST Monitor;n¢T System <br /> Name and Model of Line Leak Detectors n/a (Suction Pump) <br /> Name and Model of Annular Sensors Veeder Root ILS-350 <br /> Name and Model of Piping Sensors <br /> Name and Model of Dispenser Sensors Gasboy 52AQ <br /> Type of overfill prevention Overfill drop tube OPW61 SO <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes❑ NO❑ n/a <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ No 11 n/a <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No❑ n/a <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> Log book located in Guard Shack in th <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? 6/2003 <br /> Note:For new installations the secondary containment mast be tested 6 months after installation.All secondary containment systems <br /> mzrst be tested once every 36 months with initial testing performed before January I,2003. <br /> 8.Describe the training necessary for the operation of UST system, including piping, and the monitoring <br /> equipment. In—house training based on vendor <br /> IAUnit imuSTI monitoringplan.doc <br /> 5/30/2002 <br />