My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARKET
>
530
>
2300 - Underground Storage Tank Program
>
PR0231177
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 10:28:52 AM
Creation date
9/9/2019 9:57:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231177
PE
2332
FACILITY_ID
FA0003757
FACILITY_NAME
LMG STOCKTON INC
STREET_NUMBER
530
Direction
E
STREET_NAME
MARKET
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14913018
CURRENT_STATUS
02
SITE_LOCATION
530 E MARKET ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before malting the change. <br /> Required by Sections 2632(d) and 2641(h) CCR- <br /> Facility <br /> CRFacility Name /-A? "'fe'c 3-;z <br /> Facility Address 530 <br /> A. Describe the frequency of performig the In rlitonng: <br /> Piping 5�4 <br /> B. What methods and equipment, identified by name and model, will be used for <br /> perform;n the mon; onnQ: <br /> Tank - oo - ' G(S > ,v ��. <br /> Piping uvycP o�S c vc� <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): �i �" <br /> Z— /I P a u Ci' Y G S/t '2 C /� t ��� C /l �� / <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> Jim m V'v-Pm KP i M Ain1 coax e a S�+Pe�y►�sov'" <br /> p D 1 �.1r I� 1 N Te h�14 hiG <br /> E. Reporting format for monitoring: <br /> Tank Z-rc T <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L months: <br /> G. Describe the training necessary for the operation of YST system, including iping, <br /> and the monitoring equipment: 7�vt ,`.�; �o ✓��` o7r ti� <br />
The URL can be used to link to this page
Your browser does not support the video tag.