Laserfiche WebLink
-2- <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-99 (SA) <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $170.16 per <br /> additional daily trip-end generated in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil <br /> shall require a State NPDES construction permit. <br /> DTP:DG:ar <br /> P'\C0N0AENiS\SA\YR 2003\PA-0300099.wpd <br /> I� <br />