Laserfiche WebLink
MONITORING AND REPORTING PROGRAM ORDER NO. 5-00-056 -5 - <br /> O W ENS-BROCK W AY AND <br /> OWENS-ILLINOIS GLASS FURNACE FACILITY <br /> SAN JOAQUIN COUNTY <br /> 4. A comparison of monitoring data to the discharge specifications, groundwater limitations and <br /> surface water limitations, and explanation of any violation of those requirements. <br /> 5. Summary data tables of historical and current water table elevations and analytical results. <br /> 6. A scaled map showing relevant structures and features of the facility, the locations of <br /> monitoring wells and other sampling stations, and groundwater elevation contours referenced to <br /> mean sea level datum. <br /> 7. Copies of laboratory analytical report(g). <br /> 8. The January quarterly report shall include an evaluation of observed or potential impacts to the <br /> groundwater due to the process wastewater ponds. If groundwater quality has been degraded, <br /> then the report shall also include recommendations for reducing or mitigating the impact. <br /> The Discharger shall implement the above monitoring program as of the date of this Order. <br /> Ordered bN- <br /> p rAR C TON, Executive Officer <br /> 17 March 2000 <br /> (Date) <br /> TRO:smi00 <br /> c:wro®.w.wsoocwswnmoi r+uiaoe <br />