Laserfiche WebLink
MONITORING AND REPORTING PROGRArt ORDER NO. 5-00-056 .2 . <br /> OWENS-BROCKWAY <br /> 2 - <br /> OWENS-BROCKWAY AND <br /> OWENS-ILLINOIS GLASS FURNACE FACILITY <br /> SAN JOAQUIN COUNTY <br /> Parameter Units Type of Measurement Inspection Frequencv <br /> Sludge depth and scum thickness Feet Staff Gauee Quarterly <br /> in each compartment of each septic tank-. <br /> Distance between bottom of scum Inches Staff gauge Quarterly <br /> layer and bottom of outlet device. <br /> Distance between top of sludge layer Inches Staff gauge Quarterly <br /> and bottom of outlet device. , <br /> Septic tanks shall be pumped when any one of the following conditions exist or may occur before the <br /> next inspection: <br /> a. The combined thickness of sludge and scum exceeds one-third of the tank depth of the first <br /> compartment: or, <br /> b. The scum layer is within three inches of the outlet device; or, <br /> c. The sludge layer is within eight inches of the outlet device. <br /> In lieu of septic tank measuring, the septic tanks maybe pumped quarterly. <br /> LEACHFIELD MONITORING <br /> Both domestic wastewater systems will be visually monitored. Leachfield monitoring will consist of <br /> visual inspection of the leachfield and nearby area. The leachfield and the area downslope of the <br /> leachfield shall be inspected on a monthly basis for the presence of net areas, leachate or groundwater <br /> seepage, objectionable odors, and/or unexpected plant growth. Leachfield monitoring results shall be <br /> included with all monthly monitoring reports. <br /> PROCESS WASTEWATER EVAPORATION/PERCOLATION PONDS <br /> _ Samples shall be collected from an established sampling station located in an area which will provide a <br /> sample representative of the wastewater in Pond No. 3, or the furthest downstream treatment pond in <br /> active use. Freeboard monitoring shall be performed at all ponds. Freeboard will be measured <br /> vertically from the surface of the pond water to the lowest elevation of the surrounding berm. Process <br /> wastewater pond monitoring shall include at least the following: <br /> Sample Sampling Reporting <br /> Constituent Units Type Frequencv Frequencv <br /> Dissolved Oxygen mg/1 Grab Monthly Monthly <br /> Flow Gallons Metered Continuous Monthly <br /> Freeboard Feet Measurement Monthly Monthly <br />