My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011730
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
16310
>
2600 - Land Use Program
>
PA-1800082
>
SU0011730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:23 AM
Creation date
9/9/2019 10:10:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011730
PE
2631
FACILITY_NAME
PA-1800082
STREET_NUMBER
16310
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20923026, 20923002, 20923025
ENTERED_DATE
3/29/2018 12:00:00 AM
SITE_LOCATION
16310 W SCHULTE RD
RECEIVED_DATE
3/29/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SCHULTE\16310\PA-1800082\SU0011730\APPL.PDF \MIGRATIONS\S\SCHULTE\16310\PA-1800082\SU0011730\CDD OK.PDF \MIGRATIONS\S\SCHULTE\16310\PA-1800082\SU0011730\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 [S.JCOG , Inc . <br /> ' I S JCOG,istc. <br /> San]oaquin County Multi-3peaer Habitat Conseivakon&Open Spate Plan <br /> 555 East Weber Avenue•Stockton,CA 95202 a(209)235-0600• FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Develooment Department Planning Department Building <br /> Department Engineering Department Survey Department Transportation Department, <br /> Other: <br /> FROM: Laurel Boyd,SJCOG,Inc. , <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan(SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(1TMMs)will be issued to the project and most be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months frornmeipt of the ITMMs. <br /> IfITMMs are not signed within six months,the applicant most reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applioan;SJCOG,Inc.staff will sign the ITMMs. This is the effective data <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior many ground disturbance,the pmjmt applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of foes,either as conservation easements or fee title;or <br /> .Y v',' - d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building pcmu;whichever occurs <br /> ` firs;the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> f R� b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> fJ c. Purchase approved mitigation bank credits. <br /> t a j Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1800082 SA) <br /> Landowner: Williams Communications,Inc. Applicant: Viasat. Inc. <br /> 1 Assessor Parcel#s:209-230-02.-26 -26 <br /> i <br /> Local Jurisdiction Contact:Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.