Laserfiche WebLink
pqu�� <br /> I a THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR " STOCKTON,CALIFORNIA 95201 <br /> • q, P• (209)468-3000 FAX(209)468-2999 <br /> i <br /> www.sigov.org/pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MICHAEL SELLING Worlemg for YOU <br /> RECEIVED <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR MAY ID 7 zalU ffo <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR COmmunity Development Dept <br /> April 22, 2010 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Alex Chetley, Engineer V i <br /> Public Services Division <br /> SUBJECT: PA-1000065;A Site Approval application to construct two 226-foot-tall electricity-generating <br /> wind turbines,each with three 100-foot-long blades and 500-square-foot foundations. The <br /> maximum overall height will be 361 feet. The generated power will be used by the on-site <br /> warehouse distribution center. (Supervisorial District 5) <br /> PROPERTY OWNER: Safeway, Inc. APPLICANT: Energy Alchemy,LLC <br /> ADDRESS: 16900 W. Schulte Road APN: 209-430-01 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Schulte Road has an existing variable-width right-of-way width as shown on Record of Survey Book 33, Page 62, <br /> San Joaquin County Records,with a planned right-of-way width of 110 feet. <br /> Hansen Road has an existing variable-width right-of-way width as shown on Record of Survey Book 33, Page 62, <br /> San Joaquin County Records,with a planned right-of-way width as determined by the 2010 General Plan. <br /> RECOMMENDATIONS: <br /> 1. Equipment and materials shall not be stored along County right-of-way during construction. <br /> 2. All necessary traffic control plans for mobilizing construction equipment shall be submitted and approved <br /> by the County prior to beginning of construction. <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />