Laserfiche WebLink
Conditions of Approval <br /> UP 88-19 <br /> �- Page -15- <br /> interchange which are identified in the proposed <br /> Project Study Report. <br /> Right-of-way: <br /> The developers shall provide a right-of-way <br /> adequate to contain all the improvements to be <br /> constructed (ultimate right-of-way to be 124 foot <br /> minimum) . <br /> Wider if needed to accommodate turn lanes . <br /> Edge treatment: <br /> o Six-foot-wide paved parking lane where adjacent to <br /> Curb and gutter; four-foot-wide paved shoulder <br /> elsewhere; two-foot-wide adjacent to median. <br /> Z. Patterson Pass Road, I-580 to Schulte Road: <br /> Minimum lane configuration: <br /> Two lanes each direction. <br /> Turn lanes at intersections . <br /> o Any additional improvements at the I-580 <br /> interchange which are identified in the proposed <br /> Project Study Report. <br /> Right-of-way: <br /> The. developers shall provide a right-of-way <br /> adequate to contain all the improvements to be <br /> constructed except as noted for the curve area <br /> (ultimate right-of-way to be 124 foot minimum) . <br /> Wider if needed to accommodate turn lanes. <br /> Edge Treatment: <br /> Six--oot-wide paved parking land where adjacent to <br /> curb and gutter; four-foot-wide paved shoulder <br /> elsewhere; two-foot-wide adjacent to median. <br /> aa. Existing roads shall be reconstructed or built up where <br /> necessary, and new improvements shall be designed and <br /> 4 constructed by the developer to meet the following <br />