Laserfiche WebLink
City' s standard charges and procedures applicable to properties <br /> of similar use then in effect. <br /> 3 . Corral Hollow Line. <br /> (a) Construction. The Sewage Services shall be <br /> provided by the City to the Assignment Property via the sewer <br /> line (the "Corral Hollow Line") to be constructed by K&L and <br /> Safeway at their cost in the location set forth on Exhibit C <br /> attached hereto. K&L and Safeway shall construct the Corral <br /> Hollow Line in accordance with plans and specifications therefor <br /> approved by the City, which are set forth on Exhibit D attached <br /> hereto. K&L and Safeway shall be responsible for obtaining all <br /> necessary permits and approvals required to construct the Corral <br /> Hollow Line. K&L and Safeway shall pay all fees and charges <br /> related to the construction of such line as though it was located <br /> within the City. The City shall cooperate with K&L and Safeway <br /> in order to permit such parties to complete construction of the <br /> Corral Hollow Line on or before December 31 , 1991 . <br /> r (b) Ownership and operation. Upon completion <br /> satisfactory to the City of the Corral Hollow Line, K&L and <br /> Safeway shall dedicate the Corral Hollow Line to the City, and <br /> the City shall accept and thereafter fully own, operate and <br /> iaintain the Corral Hollow Line, provided, however, that prior to <br /> such acceptance the City shall receive an easement, license <br /> agreement or similar interest from the County of San Joaquin, on <br /> terms reasonably acceptable to the City, evidencing the City ' s <br /> ownership of the Corral Hollow Line, and its right to maintain, <br /> repair and reconstruct the same, notwithstanding that such line <br /> is installed in the County ' s right of way. Delivery of such <br /> documentation shall be deemed a construction obligation of K&L <br /> and Safeway for the purposes of this Agreement. <br /> (c) City Processing. The City shall promptly process <br /> all City approvals and permits which are required in connection <br /> with the construction of the Corral Hollow Line, including, but <br /> not limited to, processing required to comply with the California <br /> Environmental Quality Act ("CEQA") . K&L and Safeway shall pay <br /> all fees and costs required in connection with '-he City' s <br /> processing under CEQA and required under the C—y ' s ordinances <br /> and procedures of general application as the same are applicable <br /> to CEQA processing. <br /> 4 . Hansen Line. <br /> (a) Construction. The parties acknowledge that the <br /> City intends, but shall not be obligated, to construct an <br /> alternative sewer line (the "Hansen Line") to provide Sewage <br /> Services to the Assignment Property and certain other properties <br /> to be designated by the City. The Hansen Line shall be <br /> constructed, if at all, approximately in the location set forth <br /> 95\mhw\wateraup.agr 6 <br />