Laserfiche WebLink
P4uIN COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> a Z� DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> H: P.O.BOX 1810-1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> October 20, 1999 <br /> MEMORANDUM OCT 2 U 7999 <br /> TO: Thomas M. Gau, Senior Civil Engineer r;Qmmunity DevelOpment <br /> Community Development Department epr <br /> CONTACT PERSON: Chandler Martin <br /> FROM: Gabriel Karam, Senior Civil Engineer G-K- <br /> Public Services Division <br /> SUBJECT: SA-99-75 A SITE APPROVAL APPLICATION FOR A 52,800-SQUARE-FOOT <br /> ADDITION TO AN EXISTING WAREHOUSE DISTRIBUTION FACILITY, <br /> LOCATED ON THE SOUTH TERMINUS OF SCHULTE COURT, SOUTHWEST <br /> OF TRACY. (DISTRICT 5). <br /> APPLICANT: Costco Wholesale APN: 209-110-46 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. <br /> Schulte Court has an existing right-of-way width of 84 feet and a planned right-of-way width of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards C W-C 11 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable <br /> at the time of building permit application. (The fee currently is $869.00 per 1,000 gross square foot <br /> of building as Warehouse in the Tracy area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> addressed the items on the attached Waste Plan Format for Development Projects. <br /> GK:RH:ti <br /> PS-9J 11411 D <br /> F• Mnnnel T.nnP.2_ Density DirectorfDevelonment <br />