Laserfiche WebLink
i a <br /> .T <br /> zTHOMAS MP.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> mr M.GAU ' <br /> DIRECTOR STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(249)468-2999 <br /> www.sjgov.org/pubworks <br /> MICHAEL SELLING r 1 <br /> DEPUTY DIRECTOR �`Jorvda®f6f YOU �/ <br /> STEVEN WINKLER RECEIVED <br /> ED <br /> DEPUTY DIRECTOR ' <br /> ROGER JANES JUN 2 1 2011 <br /> BUSINESS ADMINISTRATOR <br /> Community Development Dept, <br /> June 21,2011 <br /> MEMORANDUM <br /> i <br /> TO: John Funderburg, Principal Planner <br /> E <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Alex Chetley,Engineer V <br /> Public Services Division <br /> SUBJECT: PA-1100095; A Site Approval application for an 80-foot-high monopole tower; located on the <br /> south side of Schulte Road approximately 250 feet east of Mac Arthur Drive, east of the City of <br /> Tracy. (Supervisorial District 5) <br /> PROPERTY OWNER: Van Blades APPLICANT: AT&T Mobility/Epic Wireless <br /> ADDRESS: 8898 W. Schulte Road,Tracy APN: 252-020-16 <br /> I <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard!Area. <br /> Schulte Road has an existing right-of-way width of 45 feet(20 feet south of the centerline)and a planned right- i <br /> of-way width of 84 feet. <br /> RECOMMENDATIONS: ? <br /> I. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application.The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />