My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005781 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEIDNER
>
17201
>
2600 - Land Use Program
>
PA-0500761
>
SU0005781 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:46 AM
Creation date
9/9/2019 10:12:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0005781
PE
2622
FACILITY_NAME
PA-0500761
STREET_NUMBER
17201
Direction
S
STREET_NAME
SEIDNER
STREET_TYPE
AVE
City
ESCALON
APN
22916015
ENTERED_DATE
11/21/2005 12:00:00 AM
SITE_LOCATION
17201 S SEIDNER AVE
RECEIVED_DATE
11/21/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SEIDNER\17201\PA-0500761\SU0005781\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. <br /> y April 13,2006 <br /> NOA Project Number. E05130B <br /> 6. 6.3 Boring Preparation and Presaturation <br /> LA total of two shallow an two eep soil borings were advanced on the Site with a truck-mounted <br /> deep rock aufjur rig on Mar 7,2006. <br /> LA 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> water in the percolation test boring. Approximately 2 inches of"pea gravel" were placed in the <br /> bottom of the open soil boring,then the PVC pipe was installed on top of the gravel. "Pea Gravel" <br /> `. was then used to backfill in the annular space. / <br /> LPresaturation of the percolation test holes occurred on Match 27,2006. The depth of water used to <br /> pre-soak was 12 inches above the bottom of the boring. <br /> L6.4 Condition of Borings After Presaturation <br /> LAfter the 24-hour soak period,the presaturated holes were found to be intact and dry on March 28, <br /> 2006. <br /> L <br /> 6.5 Percolation Test Procedure <br /> I <br /> LPercolation tests were conducted for the borings on March 28,2006 in accordance with the <br /> L requirements of the EHD. A percolation test with a duration of four hours was performed for each f <br /> shallow hole,and a test with a duration of one hour was performed for both deep holes. The last <br /> half an hour of the four hour tests,and the entirety of both one hour tests were observed by Mr. <br /> LTed Tasioplousos,Registered Environmental Health Inspector, EHD. <br /> Measurement of the water level during the percolation test was from a fixed reference point on the <br /> PVC casing using an electric well sounder with an depth accuracy of 1/100th foot. All tabulated <br /> values on the field data sheet (appendix) are in decimal feet. After water drop was observed, the <br /> holes were checked for refill. The refill level was approximately 0.5 ft(6 inches) of water above the <br /> bottom level of the percolation test hole. The readings were taken every 30 minutes for a period of <br /> ` four hours. <br /> L <br /> L <br /> 9 <br /> L "004 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.