Laserfiche WebLink
TABLE OF CONTENTS <br /> I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> II. SEPTIC SYSTEM DESIGN AND OPERATIONAL CRITERIA . . . . . . . . . . . . . . . 2 <br /> A. Existing Septic System Operational Overview <br /> i. Wastewater Flow Volumes and Characteristics <br /> B. Proposed Wastewater Disposal System Overview and Design Specifications <br /> i. Septic Tank Hydraulic Detention Time Calculation <br /> ii. New Disposal System Design Parameters and Appurtenances <br /> iii. Primary and 100% Replacement Effluent Disposal Area <br /> III. CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> IV. LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> V. REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> VI. APPENDICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> APPENDIX A: APN MAP AND PARCEL VIEWER MAP <br /> APPENDIX B: EXISTING SEPTIC TANK SPECIFICATIONS <br /> APPENDIX C: AERIAL PHOTOS ILLUSTRATING WELL DISTANCE RADII <br /> APPENDIX D: PUMP BASIN AND BIOTUBE VAULT SCHEMATICS <br /> APPENDIX E: PUMP SELECTION, CALCULATIONS AND PARAMETER DATA <br /> APPENDIX F: EHD PERMITS FOR THE ORIGINALLY INSTALLED SEPTIC SYSTEM <br /> ATTACHMENT: ENGINEERING SIZE 6°D" PLANS <br /> LLPage -1- <br /> Chesney Consulting <br />