Laserfiche WebLink
waste) , including a Sphere of Influence <br /> or district boundary change? X <br /> ** b. Will the project result in the <br /> need for or the expansion of the <br /> following services: fire and police <br /> protection, schools, parks and <br /> recreation, libraries, roads, flood <br /> control, solid waste or other public <br /> works facilities, public transit, or <br /> governmental services? X <br /> C. Will the project adversely impact <br /> existing recreational/park <br /> opportunities or require new <br /> park/recreation opportunities? X <br /> Note: ** "Yes" answers to these two questions and 9 (b) below <br /> will require additional discussion, but do not necessarily <br /> indicate a potentially significant impact. <br /> YES NO <br /> Other sources used: <br /> 9 . Transportation/Circulation: <br /> a. Will the project generate <br /> significant traffic volumes and/or <br /> make a significant contribution to <br /> an existing circulation problem <br /> (consider existing LOS on nearby <br /> arterials and highways, road design, <br /> access, parking, accident potential) ? X <br /> ** b. Will the project cause special <br /> transportation considerations <br /> (consider waterborne, rail, air, <br /> pedestrian, and bicycle traffic, <br /> and public transportation <br /> systems and parking facilities) ? X <br /> C. Will the project result in a <br /> significant increase in commuting <br /> to and from the local community? X <br /> d. Will the project be impacted <br /> by or interfere with an airport <br /> flight path? X <br /> Initial Study (Rev: 01/91) <br /> 6 <br />