Laserfiche WebLink
3 . A copy of the survey map shall be provided to the District <br /> Engineering Department for review to ensure that the above <br /> conditions have been satisfied. If a map is not required, the <br /> District shall receive verification that this easement has <br /> been provided. <br /> The purpose of the above condition is to provide a means for <br /> future owners of this newly created parcel to receive District <br /> water if it is so desired. <br /> If you have any questions, please contact Rick Barzan or myself in <br /> the Engineering Department . <br /> Very truly yours, <br /> Sam Bologna <br /> Facilities Planner/ <br /> Right-of-Way Agent <br /> CC : Rick Martin <br /> ENGR-A:\SUBMIT\FORM.MS1 <br /> 01/21/93 <br /> 2 <br />