Laserfiche WebLink
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY............................................................................................1 <br /> Introduction ................................................................................................................1 <br /> ProposedDevelopment.............................................................................................1 <br /> SiteDescription..........................................................................................................1 <br /> PastUses of the Site..................................................................................................2 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System ..................................................................................2 <br /> ProposedSeptic System................................................................................2 <br /> On-Site Septic Permit History........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................2 <br /> Septic Permit History in the Vicinity...............................................................2 <br /> Expected On-Site Maximum Septic Tank Usage...........................................3 <br /> Ground Water Information.........................................................................................3 <br /> Depthand Gradient........................................................................................3 <br /> Potential Ground Water Contamination Issues..............................................3 <br /> On-Site Wells.................................................................................................3 <br /> WaterSample................................................................................................4 <br /> SoilProfile and Geologic Information ......................................................................5 <br /> SoilBoring......................................................................................................6 <br /> Discussion of Soil Lithology...........................................................................6 <br /> PercolationTest.........................................................................................................7 <br /> Preparation and Presaturation of Percolation Test Hole................................7 <br /> Percolation Test Procedure............................................................................7 <br /> Percolation Test Results................................................................................7 <br /> Discussion of Percolation Test Results..........................................................8 <br /> Discussion of Septic System Sizing...............................................................8 <br /> CONCLUSIONS AND RECOMMENDATIONS ...............................................................9 <br /> LIMITATIONS................................................................................................................10 <br /> SELECTED REFERENCES ..........................................................................................11 <br /> LOGE 1322 <br />