Laserfiche WebLink
U.S.Department of Homeland Security <br /> FEMA Region Iii <br /> 1111 Broadway,Suite 1200 <br /> Oakland,CA.94607-4052 <br /> Ec I" <br /> July 23,2018 <br /> Frank Girardi,Project Manager <br /> San Joaquin County, Community Development Department <br /> Development Services Division <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Mr. Girardi: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Numbers PA 1800161 (SA) Site Approval application(APN/Address: 177-280-36/431 East <br /> Sperry)(Supervisorial District 1). <br /> Please review the current effective Flood Insurance Rate Maps(FIRMS)for the County of San <br /> Joaquin(Community Number 060299),Maps revised October 20,2016 and City of Stockton <br /> (Community Number 060302), Maps revised October 16,2009. Please note that the City of <br /> Stockton, San Joaquin,California is a participant in the National Flood Insurance Program <br /> (NFIP). The minimum,basic NFIP floodplain management building requirements are described <br /> in Vol.44 Code of Federal Regulations(44 CFR), Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain,(i.e.,Flood Zones A,AO, AH,AE, <br /> and Al through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM,any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings,other structures, mining,dredging,filling, <br /> grading,paving,excavation or drilling operations, and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed pl.dor to the start of <br /> development,and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> RRv%v.fema.goE <br />