Laserfiche WebLink
Fxictinn nictrirt farilitiac within n r ihlir rnnri rinhf_nf_XA1nX1 C hall ho infn n rinhf_nf_ <br /> way or easement dedicated to the District. <br /> 4. Standard Easement widths for District facilities shall be: <br /> Main Canals 100 foot centered on canal <br /> Canals/Drains 60 foot centered on canal/drain <br /> Pipelines 30 foot centered on pipeline <br /> Pipelines adjacent to roadways 20 foot <br /> Pipelines adjacent to PUE 15 foot <br /> Easement widths for joint projects shall meet the above minimum easement widths plus any <br /> additional easement width that may be required based on the specific project uses or as <br /> approved by the Board of Directors. <br /> 5. If an existing District facility is not centered on the property boundary between two <br /> properties, the District may require an easement width based on the distance to the <br /> centerline of the District facility. <br /> RECOMMENDATIONS AND CONSIDERATIONS <br /> 1. The developer should provide private irrigation easements for said properties to insure that <br /> existing downstream users can have access to irrigation water and can irrigate or continue to <br /> irrigate. <br /> 2. The developer should provide private drainage easements for the benefit of upstream <br /> parcels that have historically drained across newly created parcels. <br /> 3. If, upon review, the District determines that parcels created in a Parcel Map or Subdivision <br /> cannot irrigate efficiently, based on poor grading and planning, irrigation water will not be <br /> delivered until the situation is corrected to the sole satisfaction of the District. <br /> 4. "Improvement District' formation should be considered as a mechanism to ensure the <br /> responsible long-term operation and maintenance of private irrigation systems and as a <br /> means of irrigating parcels or lots developed under the ten-acre minimum. <br /> 5. The District shall require a Developer Agreement before any work can be done on District <br /> Facilities. Developer Agreements require a retainer for staff preparation time and additional <br /> related costs reasonably incurred by the District. <br /> 6. The District would consider financially participating in conjunctive use reservoirs constructed <br /> to serve the irrigation needs of the development. <br /> K:\Engineering\JoeFos\Forms\Subdivision Parc,elMapPolicy2004.DOC <br />