My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011688
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STERLING
>
230
>
2600 - Land Use Program
>
PA-1800001
>
SU0011688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:20 AM
Creation date
9/9/2019 10:21:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011688
PE
2690
FACILITY_NAME
PA-1800001
STREET_NUMBER
230
Direction
S
STREET_NAME
STERLING
STREET_TYPE
DR
City
MOUNTAIN HOUSE
Zip
95391-
APN
25405005, 06, 07, 08, 18
ENTERED_DATE
3/6/2018 12:00:00 AM
SITE_LOCATION
230 S STERLING DR
RECEIVED_DATE
3/5/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STERLING\230\PA-1800001\SU0011688\APPL.PDF \MIGRATIONS\S\STERLING\230\PA-1800001\SU0011688\CDD OK.PDF \MIGRATIONS\S\STERLING\230\PA-1800001\SU0011688\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company` <br /> service lines, ground rods, anodes, wires, etc.that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.