Laserfiche WebLink
2. EARTH: ( Continued ) E <br /> c. Will the : be conversion of agricul ral <br /> land ( consider prime farmland )? <br /> 3. Plant/Animal Life: <br /> a . Will there be a reduction or disturbance <br /> to any habitat for plants and animals <br /> ( including removal or disturbance of <br /> trees, riparian areas, or migration <br /> routes )? <br /> b. Will the project impact any rare, K <br /> endangered, or threatened species <br /> located on or near the site? <br /> 4. Air : <br /> Will the project result in deterioration of <br /> existing air quality, including creation of <br /> objectional odors; will future project <br /> residents be subjected to significant <br /> pollution levels? <br /> 5 . Noise: <br /> a. Will the project expose people to high <br /> noise or vibration levels? <br /> b. Will the project result in increased x <br /> noise or vibration levels? <br /> 6. Energy/Natural Resources/Hazards <br /> ( Consider the General Plan ) : <br /> a. Will the project result in any signifi- <br /> cant consumption of energy? <br /> b. Will the project affect the potential X <br /> use, extraction, conservation, or <br /> depletion of a natural resource other <br /> than agricultural land? <br /> C. Will the project create a risk of <br /> explosion, release or exposure to <br /> hazardous substances, or other dangers <br /> to public health and safety? <br /> 7 . Utilities and Public Service: <br /> *a. Will the project require alteration <br /> of, addition to, or the need for <br /> utility systems--water, sewer, drainage, <br /> solid waste--including sphere of <br /> influence or district boundary change? <br /> Initial Study - 3 - 7-90 <br />