Laserfiche WebLink
� e <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT " <br /> PA-02-405 <br /> 2. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 3. .The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy permit.. <br /> (Development Title Section 9-1145.5) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee is currently $164.8.6 per. <br /> additional daily trip-end generated in the Thornton area. The fee-shall be automatically <br /> adjusted July 1 of each rear by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. <br /> (Resolutions 00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of,building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format-for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 7. All new structures and/or substantial improvements shall have the lowest floor elevated <br /> 'to a minimum of one foot above the 100-year flood elevation of 8-feet. <br /> 8. A qualified Traffic Engineer should shall evaluate both the safety of traffic operations <br /> with the proposed project due to its adjacent location to the Tower Park Marina, and the <br /> need for additional improvements. <br /> GK:BN:ar <br /> PACONSIENTSISASYr 2002TA-020040:(revision=}-wpd <br />