Laserfiche WebLink
License No--377385 &C- ,(A & A GROSS DRILLII**-� <br /> C-57 YO . ( )209 3T4725 <br /> p.O.SOX 178 • WOODBRIDGE,GA 95258 <br /> Yard: 12880 STOCKTON BLVD. • GALT, CA L( v <br /> CONTRACT AND PROPOSAL <br /> CUSTOMER: <br /> Name C�Kyl,ILL- zl5 Water Is Our Business <br /> Address HARDROCK DRILLING, EXVkORATION, <br /> City DOMESTIC, IRRIGATION, <br /> State&Zip WATER WELLS <br /> Local Telephone No, 1, 3 67 S <br /> 1. Contractor hereby agrees to furnish to customer sereices, equipment, and materials connected with the drilling of a water well on <br /> the certain land situated in the county of S, <br /> 2. This contract does not include any installation of a test pump for the purpose of developing a well, <br /> 3. Itis expected that the well will be= o + a>z ~ _feet deep. <br /> 4. The contractor: <br /> A. Agrees to perform well drilling services under this contract in a workmanshiplike manner. <br /> B. Agrees to keep a record of the strata passed through while drilling. Blank and perforated casing used. <br /> C. It is understood by both parties that neither can tell just what will be found underneath the surface of the earth and that the work <br /> of Contractor hereunder is subject to those conditions which he may find underneath the surface. Contractor shall not be liable <br /> for any damages, direct or consequential, resulting from or connected with his inability to drill to the depth 'indicated in <br /> Paragraph 3 above, his inability to discover or develop a suitable water supply, or his abandonment of drilling operations as a <br /> result of encountering rocks, cobbles, solidified formations or other adverse underground conditions, nor does he represent or <br /> warrant the sand content, quantity, quality or kind of water, if any, which may be discovered <br /> D Contractor shalt not be liable for any consequertial damages, whether or not such damages are foreseeable at the time of this <br /> contract. Including, but not limited to, lost profits or revenues, which may result from or be connected with the services to be <br /> performed and materials to be furnished under this contract, including without limitation the condition of the well or the failure to <br /> complete the well by any specified date for any reason. <br /> E. Contractor agrees to utilize equipment in completion of the well which has the capability to drill to the depth specified.At no time <br /> shall Contractor be required to drill deeper than the capability of the equipment assigned to the job or into rock, cobbles, <br /> solidified formations, or other adverse underground conditions; upon his termination of drilling for such reason,Contractor shall <br /> be paid for all services performed up to the point of termination according to the terms of this Contract. <br /> 5. The bore hole drilling rate be subject to a per foot rock drilling surcharge, for each foot of borehole drilled in such formation. <br /> 6. Customer agrees to pay for drillinPit—% <br /> ervices & materials if used by contractor. <br /> Drilling per foot fZ(:�o T Z A 6-0Z Gravel <br /> Blank casing per foot F, S Permits c1 2 S Oo <br /> 1� <br /> Perforated casing per foot Cement So <br /> < <br /> Drilling additives Rock drilling surcharge / <br /> Conductor pipe Mobilization/Demobilization <br /> Total s <br /> 7. Contractor shall not be liable for any damages, resulting from mud, sand, rock, water, and debris taken out of any well during the <br /> progress of the work,around and about the well at such places and in such manner as contractor may choose,and shall not require <br /> contractor to remove the same. <br /> 8. The contractor shall not be liable for any collapse or blockage in any well or for the deterioration in water quantity or quality after the <br /> well's completion. <br /> 9. The customer: <br /> A. Hereby warrants that he has full right and authority to enter this contract and to authorize contractor to drill said well upon the <br /> above described land. <br /> B. Will provide, at no charge to contractor, storage of equipment and material which may be required under this contract. <br /> ---G.-_S.ftaJI permit_contrar.tor to dtimp sand-and rock areuRd-wells#e,.+Nell casing. C.�stomer wll; pe-rrit c.ntractor-tcd!1g bitsa-taurd- <br /> and about the well at such places, and in such a manner as contractor may choose. <br /> 10. "title to any material supplied by contractor will remain in contractor and will not pass to customer until the entire price called for <br /> herein, or in any subsequent extra work contract, has been paid. Customer hereby grants to contractor a security interest therein <br /> and acknowledges a mechanic's lien to secure payment of the amounts due under the terms of this contract. In the event of failure <br /> or refusal of customer to pay as provided herein, contractor shall have the right to enter upon the above-described premises and <br /> retake possession of such equipment and materials until payment is made in full. In any action to enforce the provisions of this con- <br /> tract, the prevailing party'shall be entitled to recover costs and attorney's fees. <br /> CUSTOR CONTRACTOR <br /> Name <br /> A & A GROSS DRILLING <br /> _ <br /> Address 13 <br /> G <br /> Z, <br /> Telephone <br /> DUNCAN PRESS--10O' <br />