Laserfiche WebLink
i <br /> I <br /> Rick Griffin " -2-' <br /> COMMUNITY DEVELOPMENT - ` <br /> PA-08-106 (SA) <br /> 5. All construction shall comply with..Federal, State, and San Joaquin County floodplain development <br /> regulations. -rt <br /> a) All construction materials below the base flood elevation shall be class 4 or 5 flood resistant <br /> _ materials. r, <br /> b)f All structures shall be anchored to prevent flotation, collapse, or lateral movement to the.structure <br /> resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. <br /> c)All electrical equipment and electronics shall be elevated or waterproofed to one (1) foot above the <br /> base flood elevation. <br /> !(YZ.<d) :,A.preliminary elevation certificate shall be submitted to the Flood Management Division prior to the <br /> issuance of a building permit. <br /> e) A finished construction elevation certificate shall be submitted to the Flood Management Division <br /> certifying the elevation of all electrical and electronic equipment associated with the tower structure <br /> prior to final building inspection. ' <br /> BD:SS:av n.. <br /> VNpwsrvfpGINShar NDc Scrvicm\DPubServ\COMMENTS1SAlYr 2008TA-0800003 APP.doe <br /> o <br /> k , <br />