My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007488_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
340
>
2600 - Land Use Program
>
PA-0800350
>
SU0007488_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:25 PM
Creation date
9/9/2019 10:25:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0007488
PE
2626
FACILITY_NAME
PA-0800350
STREET_NUMBER
340
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
APN
05802005
ENTERED_DATE
11/25/2008 12:00:00 AM
SITE_LOCATION
340 W HWY 12
RECEIVED_DATE
11/24/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\340\PA-0800350\SU0007488\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 22 April 2009 <br /> AGE-NC-09-1683 <br /> Page 16 of 19 <br /> 9.5. MASS BALANCE OF NITROGEN LOADING <br /> The EHD requires the user to considering all potential sources identified for wastewater generation. <br /> The EHD has required the maximumpotentially observable concentrations ofwaste water generated <br /> from the site to be evaluated for this model. <br /> Further, the EHD supports the use of Hantzsche/Finnemore, or other appropriate formula/model <br /> to calculated a mass of nitrogen loading. <br /> The Hantzsche/Finnemore (N) equation for commercial application: <br /> F <br /> Nr=,I x NR, (1-d)+R x Nb (I+R) <br /> Where, <br /> f <br /> Nr = The average concentration of nitrate-nitrogen in the recharged waste water parts per <br /> million of nitrate-nitrogen. <br /> I = Volume rate of wastewater entering the soil averaged over the <br /> gross developed area <br /> (4.5 acres) in inches per year. The total wastewater volume for proposed project will be <br /> - 750 gpd(total for multi-purpose room)x 36 days (maximum number of events per year) <br /> =27,000 gallons <br /> -42 gpd(total for warehouse) x 260 days (full-time employees)= 10,920 gallons <br /> 37,920 gallons 7.48 gallons per cubic foot= 5,070 cubic feet of wastewater. I <br /> Does not account for evapotranspiration likely to occur. <br /> NW =Total nitrogen concentration of wastewater(maximum anticipated)at 85 mg/L-N based on <br /> the average discharge. <br /> (Accounting for the loss of mg/L-N in the septic tank at 15%: 85mg/L-15%value= 72.25 <br /> mg/L and the loss from the biomat at 10%: 72.25 mg/L-10%value = 65 mg/L-N) <br /> d = Fraction of nitrogen concentration removed from the wastewater due to de-nitrification <br /> within the soil (an estimate of 25 percent for silty sands was used). <br /> R =Average rainfall rate per year: 17.28 inches and average deep infiltration: 6.59 inches. <br /> Nb = Background nitrate-nitrogen concentration of rainfall recharge, from wastewater <br /> influences. <br /> i <br /> Advanced GeoEnvironmental,Inc. <br /> E <br /> M <br />
The URL can be used to link to this page
Your browser does not support the video tag.