Laserfiche WebLink
San Joaquin County DIRECTOR <br /> 0 N . <br /> Environmental Health Department Donna " ranREHS <br /> ASSISTANT D;RECTOR <br /> 600 East Main Street Laurie co(ki0a REHS <br /> Stockton, California 95202-3029 <br /> PROGRAM COORDINATORS <br /> Carf&Ngmari RFHS <br /> C6 %like HLJ9,q1F1S. REH i RD� <br /> �r Webs;te: WWWsjgov.org/@hd <br /> klArgarol L�3(jnrlo REHS <br /> Phone: (209) 468-3420 <br /> Fax: (209) 464-0138 Jiff Carrue5co REHS. R01 <br /> K�IIRC.,V Folflv PFHS <br /> Date December 17. 2008 <br /> To: San Joaquin County Community Development Department i <br /> Attention- Jason Jones <br /> From: Lisa Medina; (209)468-3455 <br /> Senior Registered Environmental Health Specialist <br /> Subject- PA-0800350 (UP), S00007488 <br /> 340 West Highway 12, Lodi <br /> The'San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. A revised soil suitability/nitrate loading study incorporating proposed staff and customer use <br /> shall <br /> hall be submitted to the Environmental Health Department, indicating that the area is <br /> suitable for septic system usage. The studies must be approved by the Environmental <br /> Health Department prior to issuance of building permit(s). (San Joaquin County <br /> Development Title, Section 9-1105.2(d)). A review fee of$525.00 must be paid at time of <br /> submittal to the Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San <br /> Joaquin County prior to approval. A percolation test that meets absorption rates of the <br /> manual of septic tank practice or E.P.A. Design Manual for onsite wastewater treatment and <br /> disposal system is required for each parcel. A permit fee of$105.00 per percolation hole is <br /> required. <br /> B. Submit to the Environmental Health Department revised site plans showing the maximum <br /> number <br /> umber of employees and customers the sewage disposal system is being designed for. In <br /> addition, show on revised plans that the leach field area will be barricaded so it cannot be <br /> driven over, parked on, or used as a storage area. This leach field area must be used for <br /> that specific purpose only, and it cannot contain any underground utility lines (San Joaquin <br /> County Development Title, Section 9-1110.4(c)(5)). <br /> In addition, the revised site plan shall incorporate the 100% designed sewage disposal <br /> replacement area. <br /> C. Prior to issuance of building permit(s)the applicant shall submit an application for an <br /> amended permit to operate the Public Water System, including any new water lines and <br /> water usage. <br /> I I <br />