Laserfiche WebLink
UQ/ 7-0/�UV7 MON 17: 21 FAX 559 234 6061 SivAFCD a ` `' "- .'... - � -fm005/905•• •,• <br /> Mr 5alrado <br /> PA-0700125,Truck Parking Page 4 of 5 <br /> • T .. k. <br /> ;.More inform-atron.can be found at www crwmb ca govlGreenBurldrng/,_nrww:lgc oig/, <br /> www:susta1r36ble doe ov/, an d www consuiTf6f 6ergycentar orgrndeX html <br /> The appiicant/te;nant(s) should require that ail die°see eng[nes be shut off when lot in use <br /> on ' the premises to reduce emissions frorn4;rdJrng The: applicant shouldrnstall <br /> equprnertt thatproviales amernttesthat wou'Id,othenrvrse. [ae powered by itllrng:'engines - <br /> An example of such.technology includes Itlle��re :See www.iclleairecorn/; <br /> Idle induction technologies save fuel and reduce diesel emissions from rdiir�g.trucks anti <br /> construction equipmen#. The applicant sh71ould incorporate idle reduct�orr:strate'gres that <br /> reduce .the main p:ropuEsion engine idling tirrie through alternative techriolvges. <br /> Examples of such technologies can .tie #o'und o6-t 67 U:S: Environmental Protection <br /> f Agency'swebsite www e a ovIota smarfwa Yidiin technolo ies:hfm. idle reduction <br /> mitigation Measures'incluide, <br /> Require that all diesel engines be shut off:when not'in,Use to reduce emiss <br /> idlin ions from <br /> If Truck Refrigeration Units:.(TRU,$) wliff be utilized, provide an alternative energy <br /> i source for the TR.0 to allow diesel engines to be completely turned off. <br /> • Electrify truck-parking areas to allow trucks with sleeper cabs to use electric heating <br /> and cooling to eliminate the need to idle their diesel engines. <br /> Construction activity mitigation measures include; <br /> • Limit area subject to excavation, grading, and otherconstruction activity at any one <br /> time <br /> • Limit the hours of operation of heavy duty equipment and/or the amount of <br /> equipment in use - <br /> " Re lace fossil-fueled equipment with electrically driven equivalents <br /> (provided they <br /> are not run via a portable generator set) <br /> • Require that all diesel engines be sheat off when not in use to reduce emissions from <br /> idling <br /> • Curtail construction during periods of high ambient pollutant concentrations; this may <br /> include ceasing of construction activity during the peak-hour of vehicular traffic on <br /> adjacent roadways, and "Spare the Air Days" declared by the District. <br /> Implement activity management (e.g. rescheduling activities to reduce short-term <br /> impacts) <br /> • During the smog season (May through October), lengthen the construction period to <br /> minimize the number of vehicles and equipment operating at the same time. <br /> • Off road trucks should be equipped with on-road engines when possible. <br /> • Minimize obstruction of traffic on adjacent roadways. <br /> The District encourages the applicant and fleet operators using the facility to take <br /> advantage of the District's Heavy-Duty Engine program to reduce project emissions. <br /> The Heavy Duty program provides incentives for the replacement of older diesel <br /> engines with new, cleaner, fuel-efficient diesel engines. The program also provides <br /> incentives for the re-power of older, heavy-duty trucks with cleaner diesel engines or <br /> alternative fuel engines. New alternative fuel heavy-duty trucks also qualify. For more <br /> l <br />