My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002414
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5790
>
2600 - Land Use Program
>
UP-91-03
>
SU0002414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:10 PM
Creation date
9/9/2019 10:26:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002414
PE
2626
FACILITY_NAME
UP-91-03
STREET_NUMBER
5790
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
5790 W HWY 12
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\5790\UP-91-03\SU0002414\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t KJELDSEN-SINNOCK & ASSOCIATES, INC. <br /> CONSULTING CIVIL ENGINEERS <br /> KENNETH L. KJELDSEN 1113 WEST FREMONT STREET <br /> STEPHEN K. SINNOCK POST OFFICE BOX 844 TELEPHONE 946.0268 <br /> CHRISTOPHER H. NEUDECK STOCKTO N, CALIFORNIA 95201-0844 AREA CODE 209 <br /> FAX NO. 946.0296 <br /> 1191-001 . 0 <br /> October 1 , 1990 <br /> Mr. Manuel Lopez <br /> Department of Public Works <br /> San Joaquin County <br /> P. 0. Box 1810 <br /> Stockton, California 95201 <br /> Re: Halloum Use Permit Application No. UP91-3 <br /> Dear Mr. Lopez : <br /> Pursuant to our telephone conversation of last week, <br /> enclosed please find the septic tank/leach field design <br /> calculations , and the supporting information, for the above <br /> referenced project . The enclosed information is intended to <br /> supplement the information which has been previously submitted to <br /> the Public Works Department . <br /> I would also like to reiterate several significant issues <br /> which I believe are important to the proper evaluation of this <br /> project : <br /> 1 . The Halloum site is not immediately adjacent to the <br /> Rocky' s site which has had numerous problems with <br /> its septic system. The Halloum site is <br /> approximately 1/2 mile east of the Rocky' s site . <br /> 2 . The groundwater conditions and the soils <br /> characteristics at the Halloum site are <br /> substantially different from those which exist at <br /> the Rocky' s site . <br /> 3 . It is my understanding that the Rocky ' s problem has <br /> been aggravated by improper installation and truck <br /> traffic driving over the leach field area. The <br /> Halloum project will have barricades around the <br /> leach field area to preclude such a problem. <br /> 4 . There are existing residences on the Halloum site <br /> which are served by existing septic systems . To my <br /> knowledge , they have operated effectively over the <br /> years with no reported failures . <br /> 5 . The applicant , Mr . Halloum, is not opposed to <br /> connecting to a public sewerage system when such <br />
The URL can be used to link to this page
Your browser does not support the video tag.