Laserfiche WebLink
APPLICATION- SITE APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ENVIRONMENTAL INFORMATIONI <br /> (USE APOITIONAL PAPEi'., IF NECESSARY) <br /> Water, Drainage and Ffoudinc <br /> Describe any areas sun ect to flooding include flood depths and flood panel map number): <br /> FLOOD ZONE "B" - PANEL NO. 060299 0165 B <br /> FLOOD DEPTH LESS THAN 1 FOOT <br /> Describe the current depth of the ground water and depth to potable water: <br /> GROUND WATER 75 FEET---- - POTABLE WATER 150 FEET <br /> Describe any existing drainage courses or eroded areas on or near the project site(e.g.rivers,creeks,swales or drainage ditches): <br /> NONE <br /> Land.Land Use:anit�[ota < >: <br /> Describe the site's topography(e. .land forms,slopes,etc.): <br /> LEVEL <br /> Describe agricultural land that will be lost as a result of the Project(type of cro s,acres,quality of soil,etc.): <br /> ArRFOF SAND IOAM SOTI WITH VINEYARD <br /> Describe any wildlife habitat on-site and species that are of may be presenL <br /> BIRDS & RODENTS <br /> Describe any vegetation on-site by type and extent: <br /> 5 ACRES OF VINEYARD <br /> Air Quality <br /> Describe air pollutants that may result from the project(e.g.construction related dust,vehicle trips per day,fire places.incmerators,etc.): <br /> BESIDES CONSTRUCTION RELATED DUST - PHASE I WILL GENERATE APPROXIMATELY 25 <br /> VEHICLE TRIPS PER DAY - PHASE II WILL GENERATE OVER 100 <br /> Other <br /> Describe an items of historical or archaeological interest on-site(e.g.cemeteries or structures): <br /> NUNE <br /> Describe any on-site or off-site-sources of noise or vibration(e.g.freeway noise,heavy equipment.etc.): <br /> ON-SITE - TRUCKS LEAVING AND ARRIVING <br /> OFF-SITE - HIGHWAY NOISE <br /> Describe any on-site or off-site sources of light of glare(e.g.parkinglot lighting,or reflective materials used): <br /> NONE <br /> Describe any on-site or off-site source of odor(e.g.agricultural wasted: <br /> NONE <br /> Describe any displacement of people that will be caused by the project(e.g.numbers of people,housing units): <br /> NONE <br />