My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003424
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
6318
>
2600 - Land Use Program
>
PA-0400177
>
SU0003424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:11 PM
Creation date
9/9/2019 10:26:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003424
PE
2632
FACILITY_NAME
PA-0400177
STREET_NUMBER
6318
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
APN
04912003
ENTERED_DATE
4/16/2004 12:00:00 AM
SITE_LOCATION
6318 E HWY 12
RECEIVED_DATE
4/13/2004 12:00:00 AM
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\6318\PA-0400177\SU0003424\APPL.PDF \MIGRATIONS\T\HWY 12\6318\PA-0400177\SU0003424\CDD OK.PDF \MIGRATIONS\T\HWY 12\6318\PA-0400177\SU0003424\EH COND.PDF \MIGRATIONS\T\HWY 12\6318\PA-0400177\SU0003424\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coNnITIONS OF APPROVA1 <br /> PA-0400177 <br /> AI-Homoud <br /> Site Approval Application No. PA-0400177 was approved by the San Joaquin County Community <br /> Development Department on August 18, 2004. The effective date of approval is August 28, 2004. <br /> This approval will expire on February 27, 2006, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary building <br /> permits have been secured and remain in force, and (3) all necessary permits from other agencies <br /> have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Raymond Hoo, 468-3164) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the parking of trucks and trailers to be completed in three <br /> phases. Phase 1 will include an office, covered truck parking, and drainage pond. Phase 2 will <br /> include two 5,000 square foot buildings for truck and trailer maintenance and repair. Phase 3 will <br /> include an outdoor trailer storage area, and a 5,000 square foot building. Phases 1 and 2 are to be <br /> completed within 18 months, and Phase 3 is to be completed within 36 months. The project (Use <br /> Type: Truck Sales and Service, Parking and Repairs) is approved as shown on the Site Plan dated <br /> April 1, 2004. <br /> c. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces and all major circulation drive lanes, including driveways and maneuvering <br /> areas, shall be surfaced and permanently maintained with a minimum of two (2) inches of <br /> asphalt concrete over an appropriate base. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. All other areas that are used for <br /> vehicular traffic shall be surfaced and permanently maintained with a chip seal. Aggregate <br /> base may be used for trailer storage areas. <br /> (2) A minimum of fifteen (15) parking spaces shall be provided, including one (1) van accessible <br /> space. Accessible spaces shall be located as close as possible to the primary entrance to <br /> the main building (C.C.R., Title 24). (One space is required for every 1,000 square feet of <br /> building area. [Development Title Section 9-1015.3]) <br /> Conditions of Approval - 1 - PA-0400177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.