Laserfiche WebLink
SAN JOAQUIN V;_.--.+EY UNIFIED AIR POLLUTION Cly ROL DISTRICT <br /> ' 'Compliance:Assistance.Bulietin December, 1994= W <br /> Asbestos Synopsis <br /> I <br /> Definitions.Continued <br /> Regulated Asbestos-Containing (1)Friable asbestos-containing material(ACM). <br /> Materials(RACM)Include: (2)Category 1 nonfriable ACM in poor condition and"has become friable"or that has or <br /> �•. will be subjected to sanding,grinding,cutting,or abrading.' <br /> (3)Category 11 nonfriable ACM that has a high probability of becoming,or as become, <br /> crumbled,pulverized,or reduced to powder by the forces expected to act on the material <br /> in the course of demolition or renovation. <br /> I <br /> Friable Asbestos-Containing Any material containing more than 1 percent asbestos,as determined by Polarized Light <br /> Material IACMI: Microscopy(PLM)testing,which,when dry,can be crumbled,pulverized,or reduced to ' <br /> powder by hand pressure. <br /> Category I nonfriable ACM: r Any asbestos-containing packings,gaskets,resilient floor coverings,and asphalt roofing , <br /> products containing more than 1 percent asbestos as determined by PLM testing. i <br /> Category 11 nonfriable ACM: Any asbestos-containing materials,excluding Category 1 ACM,containing more than 1 <br /> percent asbestos as determined by PLM testing,which when dry,cannot be crumbled, <br /> pulverized,or reduced to powder by hand pressure. <br /> Inspection:done by,or under the direction of a Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. <br /> F"r <br /> • Any renovation activity in which more than 160 sq.ft.of any building material or 260 linear feet of pipe insulation will be disturbed. j <br /> An inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be removed in <br /> accordance with the NESHAP. <br /> r <br /> Inspection Rgort Must Include: <br /> I <br /> • A schematic showing the location of all tested materials: r <br /> I <br /> • The following data for all asbestos-containing materials: I <br /> 1.The amount and description of each material. T <br /> i <br /> 2. Percent asbestos content. <br /> 3.Whether or not the material is friable. <br /> Notification: An asbestos notification must be submitted to the District at least 10 workho days prior r '! <br /> 1.Any regulated demolition. <br /> 2.Any renovation in which more than 16o sq.ft.or 260 linear ft.of RACM will be disturbed. <br /> A copy of the Asbestos Inspection Report must be included with the Notification. k <br /> Notification will not be considered complete,nor will the i0 working,day notice period begin until all required information and fees ' <br /> have been submitted to the District. t € <br /> Fees:District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects,whether gr not asbestos is preSML <br /> Demalitlon Release Form:The California Health and Safety Code requires that the city or county building official have proof of i <br /> compliance with,or exemption from,the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP_notification requirements have been <br /> complied with,the District will issue a Demolition Release Form to the person who submitted the notification. <br /> i <br /> d Waste Disposal: <br /> The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br /> I <br /> I <br /> I <br />