Laserfiche WebLink
SAN JOAQUIN VAL-CEY-UNIFIED AIR POLLUTION.C& TROL DISTRICT <br /> Compliance Assistance-Bulletin=`Decemb`elr,,1994" <br /> Asbestos Synopsis , <br /> �... .r .�.� .Y< •.Y - d <br /> Definitions,Continued <br /> Regulated Asbestos-Containing (1) Friable asbestos-containing material(ACM)... <br /> Materials(RACM)Include: (2)Category 1 nonfriable ACM in poor condition and"has become friable"or that has orj; �- ,. <br /> will be subjected to sanding,grinding,cutting,or abrading. <br /> (3)Category II nonfriable ACM that has a high probability of becoming,or as become,­ 7, f <br /> t crumbled,pulverized,or reduced to:powder by the forces expected to act on the material <br /> in the course of demolition or renovation. <br /> Friable Asbestos-Containing{..; Any material containing more than 1 percent asbestos,as determined by Polarized Light <br /> Matarial(ACM) Microscopy(PLM)testing,which,when dry,can be crumbled,­pulverized,or reduced to <br /> powder by hand pressure. <br /> ' I <br /> Category I nonfKable'ACM. Any asbestos-containing packings,gaskets,Fesilient floor coverings,and asphalt roofing r <br /> products containing more than.1 percent asbestos as determined by PLM testing.- <br /> Category 11 nonfriable ACM. Any asbestos-containing materials,excluding Category 1 ACM,containing more than 1 <br /> + percent asbestos as determined by PLM testing,which when dry,cannot be ctvmbled,,. <br /> pulverized,or reduced to powder by hand pressure. <br /> Inspection:done by,or under the direction of a Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. } <br /> • Any renovation activity in which more than 160 sq.ft.of any, building material or 260 linear feet df pipe insulation will be disturbed: ' <br /> An inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be removed in <br /> accordance with the NESHAP. <br /> Ipspftction Report Must Include: <br /> • A schematic showing the location of all tested materials. t .y <br /> • The following data for all asbestos-containing materials: " <br /> 1.The amount and description of each material. <br /> 2.Percent asbestos content. <br /> 3.Whether or not the material is friable. <br /> :f <br /> Notification: An asbestos notification must be submitted to the District at least 10_working days prior to: i <br /> 1.Any regulated demolition. <br /> 2.Any renovation in which more than 160 sq.ft.or 260 linear ft.of RACM will be disturbed.. <br /> A copy of the Asbestos Inspection Report must be Included with the Notification. '" F r <br /> Notification will not be considered complete,nor will the 10 working day notice period begin until all required information and fees <br /> have been submitted to the District.+ <br /> Ems:District Rule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects,whether or notes ejtos isrep sent. <br /> Demolition Release Form:The California Health and Safety Code requires that the city or county building official have proof of . <br /> compliance with,or exemption from,the asbestos notification requirement before he or she issues a,demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been i <br /> complied with,the District will issue a Demolition Release Form to the person who submitted the notification. <br /> Repysle and Waste Disposal-The asbestos notification must also identify any building materials which will be recycled after •- <br /> removal from a project. The name of the recycling.contractor and location of such activity must,be identified. <br />