Laserfiche WebLink
Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-02-019(SA) <br /> The applioant shall complete the fellewi before the Department of I'VA-4a ean <br /> The developef shall deposit funds with the County fef:all eests, as estimated by the Depaltment of <br /> eentfaeting for-the Fequir-ed study. An)'fnifigation fequifed by the tmffir.study shall be provided by <br /> e 2kpjC-&int. mo:,olon, „+ r;+ice ee +; .r n 1150.T) <br /> Upon satisfaetien of the above requirements,feeenvnended Conditions Of apffeval May be neeessafy b <br /> RECOMMENDATIONS: <br /> 1, An encroachment permit shall be required for work within the County road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building pen-nit application. (The fee currently is$207.97 per additional daily trip-end <br /> generated in the Lodi area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) (A efedit may <br /> be allowed if it ean be ver-ified theA the existing development on this site was in operation on ef bef6Fe <br /> A pfil 23 ,non ), (Resolution R-00-433) <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee is based on the current schedule. <br /> (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. The project shall comply with all required National Pollution Discharge Elimination System(NPDES) <br /> storm water quality measures. <br /> 8. Landscape vegetation on the northwest corner of the southbound Cherry Road approach to SR 12 shall <br /> be removed from the area within 40 feet of the centerline of SR 12 and within 85 feet of the centerline <br /> of Cherry Road <br /> BD:SS:av <br /> P:ICOMMfiNTS1SA\Yr 2002\PA-0200019 REVISION of Approved Action-Revision.doc <br />