My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002670
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
2600 - Land Use Program
>
SA-99-41
>
SU0002670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:10 PM
Creation date
9/9/2019 10:27:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002670
PE
2633
FACILITY_NAME
SA-99-41
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
8751 E HWY 12
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 12\8751\SA-99-41\SU0002670\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation Workplan -2 - <br /> Monitoring <br /> 2 - <br /> Monitoring Well Installation Report <br /> F. Soil Sampling (if applicable): <br /> Cuttings disposal method <br /> .Analyses to be run and methods <br /> Sample collection and preservation method <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling (48 hours) <br /> Well purging method and amount of purge water <br /> Sample collection and preservation method <br /> QA/QC procedures <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.1 foot. Method and time of water <br /> level measurement shall be specified. <br /> I. Proposed time schedule for work. <br /> Monitoring Well Installation Report of Results <br /> A. Well Construction: <br /> Number and depth of wells drilled <br /> Date(s)wells drilled <br /> Description of drilling and construction <br /> Approximate locations relative to facility site(s) <br /> A well construction diagram for each well must be included in the report, and should contain <br /> the following details: <br /> Total depth drilled <br /> Depth of open hole (same as total depth drilled if no caving occurs) <br /> Footage of hole collapsed <br /> Length of slotted casing installed <br /> Depth of bottom of casing <br /> Depth to top of sand pack <br /> Thickness of sand pack <br /> Depth to top of bentonite seal <br /> Thickness of bentonite seal <br /> Thickness of concrete grout <br /> Boring diameter <br /> Casing diameter <br /> Casing material <br /> I'\PmM�Pil�lF(1PMllmvwll�.rlv. <br />
The URL can be used to link to this page
Your browser does not support the video tag.