Laserfiche WebLink
, I <br /> " Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENT <br /> i <br /> PA-02-146 <br /> 3. The,'Traf c Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $613 per 6 <br /> 1,000 gross square foot of building designated as manufacturing or$ 159.47 per additional <br /> F` daily trip-end generated in the Delta area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record. 'I <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development P <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:a <br /> P:.00N1MENT AIYr2002tiPA-02-146.wpd <br /> u <br /> �4 <br /> 5 'F <br /> f <br /> II <br /> ` t �� <br /> E I fi <br /> a ,I� <br /> E i � •• 'f 11 <br /> r <br /> q ,g <br /> w I <br />