Laserfiche WebLink
e <br /> Kerry Sullivan =2- ' <br /> .COMMENTS ON:DEVELOPMENT <br /> PA-02=146 <br /> a <br /> I <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due.. <br /> and payable at the time of building permit application. (The fee currently is $613 per <br /> 1,000 gross square foot of building designated as manufacturing or$ 159.47 per additional- <br /> daily trip-end generated in the Delta area. The fee shall be automatically adj usted July•i.of . <br /> each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record. : y <br /> (Resolutions 00=433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development ; <br /> Projects. Final Site Plan is required upon submittal of verification. • , r € y' <br /> GK:BN:a 8 :� x 4 .. ,; t�,•sf <br /> P:1C0MNMNT A1Yr 20021PA-02-146.w1>d <br /> 01 <br /> ..4 <br /> t r , <br /> i <br /> I <br /> I <br /> K ' ._. .. rr . r .' r� •� .-., vim-� -•al__ �� �. .�,,:,,-�-k - 'i.i 4a. <br />