Laserfiche WebLink
c�Q' "co,, Department of Public Works <br /> _ 1 SANJOAQUIN <br /> o�^'Y%, Kris Balaji,Director of Public Works <br /> —COUNTY— a p� <br /> Fritz Buchman,Deputy Director/Development <br /> Greatness grows here. Michael Selling,Deputy Director/Engineering <br /> woeiavg ice YOU Jim Stone,Deputy Director/Operations <br /> August 13,2018 Krish Rhea,Manager of Strategic Initiatives <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON: Megan Aguirre <br /> FROM: Alex Chetley,Engineering Services Manage <br /> Development Services Division <br /> SUBJECT: PA-1800074,PA-1800188;A Site Approval application to expand an existing small <br /> winery to include the construction of a crush pad and a 6,500 square foot wine storage <br /> building with dry lab and a Deviation Application to reduce the minimum side yard <br /> setback from 300 feet to 200 feet in the AG-40(General Agricultural,40-acre minimum) <br /> zone for the construction of the proposed storage building and related improvements; <br /> located on the southwest comer of East Taddei Road and North Bender Road,Acampo. <br /> (Supervisorial District 4) <br /> PROPERTY OWNER Larry&Teri Lawrence APPLICANT: Viaggio,Inc <br /> ADDRESS: 108 East Taddei Road,Acampo APN: 013-130-26,013-130-27,and 013-130-28 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated Flood Hazard <br /> Area designated as Zone AE and X. The 100-Year Flood Elevation will be approximately 37 feet NAVD <br /> 1988. <br /> Taddei Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application.The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />