My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011892
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TADDEI
>
108
>
2600 - Land Use Program
>
PA-1800188
>
SU0011892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 8:29:37 AM
Creation date
9/9/2019 10:32:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011892
PE
2660
FACILITY_NAME
PA-1800188
STREET_NUMBER
108
Direction
E
STREET_NAME
TADDEI
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01313027, 01313028, 013130226
ENTERED_DATE
8/16/2018 12:00:00 AM
SITE_LOCATION
108 E TADDEI RD
RECEIVED_DATE
8/14/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TADDEI\108\PA-1800188\SU0011892\APPL.PDF \MIGRATIONS\T\TADDEI\108\PA-1800188\SU0011892\CDD OK.PDF \MIGRATIONS\T\TADDEI\108\PA-1800188\SU0011892\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG , Inc . <br /> S JC0G,Inc. <br /> San Joaquin County Afulti-Species Habitat Conservation &Open Space Plan <br /> 555 Fast Weber Avenue•Stockton,CA 95202• (209)235-0600 • FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction, Community Development Department Plannino Department Building <br /> Deoartment Engineering Department Survey Department Transportation Department <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> I) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the rIWIMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> . ;;`. a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> f p Project Title: PA-1800074(SA).PA-1800188( <br /> it, 3 <br /> yr Landonwer: Larry&Teri Lawrence Applicant: Viaggio, Inc. <br /> Assessor Parcel#s: 013-130-26.-27.-28 <br /> T , R , Section(s): <br /> r <br /> Local Jurisdiction Contact: Megan Aguirre <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.